Flint to Otter Lake

The Otter Lake Branch

Reset
Terrain
Roadmap
Satellite
Point of Interest

GOOGLE MAPS no longer available: With apologies, I am unable to continue showing Google Maps. Google has forced my hand by increasing their map usage fee from nothing/free to OVER $300 A MONTH for the Abandoned Rails website! This is an expense that I simply cannot afford. Rest assured I am looking at available open source alternatives, so maps should be back online soon!

Greg Harrison
AbandonedRails.com

This line was built in 1857 under the Flint and Pere Marquette Railroad, and at first extended between Flint and Otter Lake. Eventually the line was completed to Fostoria. Abandonment came in two stages: the first between Otisville and Fostoria in 1955, and the rest of the line by 1987.

Today, the Huckleberry Railroad operates a 3-foot gauge tourist train over part of the route, north of Flint.

No comments have been posted for this page yet.


Shortened Link: http://a-r.us/t9z

Do you have any pictures or information about The Otter Lake Branch? Please . You will get credit for anything you contribute.